Before and (Almost) After: Master Bathroom

The last room I’ll show this week is the master bathroom – as it’s the only room left with a significant noticeable difference.  The other rooms (living room, dining, den, etc.) are definitely different but it’s small differences that make it more comfortable – removing popcorn ceiling, installing hardwood floors, new trim, etc.  So I’ll wait to show those until the new furniture comes (and is ordered :)) before showing the rooms.

Anyway, here is the master bathroom before we moved in…in all its pink and sunken tub glory:

Master Bathroom with matching pink sinks.

Master Bathroom with matching pink sinks.

Sunken pink tub

Sunken pink tub

My inspiration for the bathroom was something classic with marble tiles and black accents:

Inspiration image

Inspiration image (Pinterest)

This is where we stand now:

Shower stall tiling completed.

Master Bath 1Master Bath 3

The other side of the bathroom is where we’ve stalled: Master Bath 2But everything is now fixed so we can finish it up:

  • Install light fixtures (already purchased)
  • Install cabinet doors (now that plumbing is fixed)
  • Prime and paint
  • Cabinet handles
  • Install thermostat for heated floors
  • Add storage

This room is clearly the most far along and I actually think we’ll finish this weekend.  I’ve said that for the past few weeks so let’s hope I’m right!!

Have a great weekend!

1 reply

Trackbacks & Pingbacks

  1. […] and leveled the floor from the sunken tub to make one massive shower.  Next we added a lot of marble and black tile, heated floor mats, white Quartz countertops, and chrome accents.  And here’s the final […]

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply